On this page
The PAUSE SCHEDULES
statement can be used to pause backup schedules.
After pausing a schedule, you can resume it with RESUME SCHEDULES
.
Required privileges
The following users can pause a schedule:
- Members of the
admin
role. By default, theroot
user belongs to theadmin
role. - New in v22.2: Owners of a backup schedule, i.e., the user that created the backup schedule.
Synopsis
PAUSE SCHEDULES <selectclause>
select clause: select statement returning schedule id to pause.
PAUSE SCHEDULE <scheduleID>
Parameters
Parameter | Description |
---|---|
selectclause |
A selection query that returns id (s) to pause. |
scheduleID |
The id of the schedule you want to pause, which can be found with SHOW SCHEDULES . |
Examples
Pause a single schedule
> PAUSE SCHEDULE 589963390487363585;
PAUSE SCHEDULES 1
Pause multiple schedules
To pause multiple schedules, nest a SELECT
clause that retrieves id
(s) inside the PAUSE SCHEDULES
statement:
> PAUSE SCHEDULES WITH x AS (SHOW SCHEDULES) SELECT id FROM x WHERE label = 'schedule_database';
PAUSE SCHEDULES 4
In this example, all schedules with the label schedule_database
are paused.